Practice

ISRO aims to end the year with first operational launch of SSLV

The Indian Express

Why in News

The Indian Space Research Organisation (ISRO) is targeting the first operational launch of its Small Satellite Launch Vehicle (SSLV) in December 2026, after back-to-back failures of the Polar Satellite Launch Vehicle (PSLV).

Prelims Pointers

  • Small Satellite Launch Vehicle (SSLV):
    1. SSLV has three solid-fuel stages and a liquid-fuel Velocity Trimming Module (VTM) that fine-tunes the final orbit.
    2. It can place satellites of 10 to 500 kg into a 500 km planar Low Earth Orbit (LEO).
    3. Its key features are low cost, quick turnaround and launch-on-demand.
  • SSLV development flights:
    1. SSLV-D1 (August 2022) failed to place Earth Observation Satellite (EOS)-02 and AzaadiSAT in the intended orbit.
    2. SSLV-D2 (February 2023) placed EOS-07, Janus-1 and AzaadiSAT-2 into orbit.
    3. SSLV-D3 (August 2024) placed EOS-08 into orbit and completed the development phase.
  • SSLV technology transfer:
    1. Hindustan Aeronautics Limited (HAL) signed an SSLV technology transfer agreement on 10 September 2025 with ISRO, NewSpace India Limited (NSIL) and the Indian National Space Promotion and Authorisation Centre (IN-SPACe).
    2. It was the 100th technology transfer facilitated by IN-SPACe.
  • Polar Satellite Launch Vehicle (PSLV):
    1. PSLV is a four-stage vehicle with alternating solid and liquid stages.
    2. PSLV-C61 (May 2025) and PSLV-C62 (January 2026) both failed because of problems in the third stage.
    3. PSLV-N1 will be the first industry-built PSLV, made by a HAL and Larsen and Toubro (L&T) consortium for NSIL.
    4. PSLV mainly launches Earth observation satellites into low orbits, while the Geosynchronous Satellite Launch Vehicle (GSLV) mainly launches communication satellites.
  • Other Indian launch vehicles:
    1. GSLV Mk II uses an indigenous cryogenic upper stage.
    2. Launch Vehicle Mark-3 (LVM3), earlier called GSLV Mk III, is a three-stage vehicle with two solid strap-on boosters (S200), a liquid core stage (L110) and a cryogenic upper stage (C25).
    3. LVM3 launched Chandrayaan-2 (2019) and Chandrayaan-3 (2023), and its human-rated version will fly the Gaganyaan missions.
    4. PSLV launched Chandrayaan-1 (2008) and the Mars Orbiter Mission (Mangalyaan) in 2013.
  • Other launches in 2026:
    1. GSLV-F17 launched EOS-05, India's first imaging satellite in geosynchronous orbit, on 4 September 2026.
    2. GSLV-F18 launched the navigation satellite NVS-03 on 30 October 2026 for continuity of the Navigation with Indian Constellation (NavIC) system.

Prelims Traps

  • “Satellites launched by PSLV appear permanently fixed in the sky from a given place on Earth.” This is incorrect because PSLV mainly places satellites in low Earth orbits, while geostationary satellites appear fixed. (UPSC Prelims 2018)
  • “SSLV uses a cryogenic upper stage.” This is incorrect because it uses three solid stages and a liquid Velocity Trimming Module.
  • “SSLV technology was transferred to Larsen and Toubro.” This is incorrect because it was transferred to HAL, while the HAL-L&T consortium is building PSLV-N1.
  • “GSLV Mk III is a four-stage vehicle with solid first and third stages.” This is incorrect because LVM3 is a three-stage vehicle with solid strap-ons, a liquid core and a cryogenic upper stage. (UPSC Prelims 2018)

How much can you remember?

Practice